Committee set up to monitor load shedding

A committee has been set up to ensure the strict adherence to the latest load shedding timetable published by the Electricity Company of Ghana, (ECG).

The committee consists of representatives from ECG, Ghana Grid Company (GRDICo) and Volta River Authority (VRA).

Isaac Kirk Coffie, Chief Executive Officer of VRA in an interview with TV3 said the committee would also ensure that households are not short-changed.

The Power rationing in the country has increased in the last couple of months after the ECG decided to shed almost 450 megawatts of power.

A load shedding guide was made available for the first time for industries last Monday.

In the new timetable the amount of power supplied to mining industries in the country would also be cut by 25 percent.

According to the ECG, the decision was taken with the mining companies.

Source: GhanaWeb

You may like

Mahama pledges to implement Constitution review recommendations

EXPEDITE PROBE INTO 2024 ELECTORAL VIOLENCE – MAHAMA TO IGP

Over 300 grassroots from Ajumako rally for Bryan Acheampong as NPP’s Presidential Candidate

“A Dream Come True”: Ghana’s Mohammed Fuseini Gears Up for Champions League Debut

Dundee United Snap Up Ghana’s Isaac Pappoe on Loan from Ferencváros

Ghana’s Gold reserves surge to 32.99 tonnes

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE