Tema Motorway works cause diversions

The Ghana Highway Authority (GHA) has announced that work on the second phase of the Akosombo and Harbour approach roads meant to improve traffic flow on the Tema Motorway Roundabout, will commence on Sunday, April 30, 2017.

As a result, there will be temporary diversions of the adjoining roads at the Motorway Roundabout.

All vehicles passing through the Tema Motorway Roundabout (from Accra, Akosombo or Aflao roads) moving to Tema Harbour shall be diverted to use the Hospital Road and Hospital Link Road as alternate routes, to join the main Harbour Road at the Total filling station.

The Hospital Road will be used as a one-way link from Tema Roundabout to Hospital Link.

According to the GHA, there will be slow movement along the Akosombo-Roundabout road due to the ongoing road expansion works. The second phase is expected to last for three months.

Motorists and pedestrians have been advised to heed the diversion signs and give their maximum cooperation.

Source: GhanaWeb

You may like

2025 WAFU ZONE B: Ghana Defeats Niger 2-0 to Finish Third at 2025 WAFU U20 Championship

Sammy Gyamfi Sues Afia Schwarzenegger for Defamation; Demands GH₵10 Million In Damages 

One Dead in Ejura Fuel Station Fire as GNFS Warns Against Unauthorized Fuel Storage

Woman returns from holiday to find 70 chicks have hatched from eggs she bought

BBC radio presenter dies in car crash while on holiday with family

Family Demands Answers as Body of Ghanaian Student Who Died Mysteriously in Latvia Is Returned Home

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE