Atuabo gas plant shuts down for maintenance

The Atuabo Gas Processing Plant in the Ellembele District of the Western Region, has been shut down for its first mandatory maintenance work. The ongoing repair works is expected to last between10 and 14 days.

The Ghana Gas Company which began operations in November last year, on April 10 2015, issued a statement on its first mandatory maintenance work on the Atuabo Gas Processing Plant.

Aside the required safety procedures, the planned shutdown is also needed for warranty assurance and viability of its operating insurance.

The Volta River Authority said the temporal shutdown of the processing plant would not impact negatively on the power crisis.

VRA in a statement said the authority had procured sufficient crude oil for its thermal plants at Aboadze for the period of the shutdown.

The Atuabo Gas Processing Plant provides liquefied natural gas for the thermal plants at Aboadze

Source: GhanaWeb

You may like

President Mahama has provided substantial relief and progress for the country – Jaman South MCE

Seek medical attention promptly upon discovering any symptoms of illness. – Health Director

I shall establish taskforce to advocate for improved sanitation – Newly enstooled Sumankwaahene

BONO EAST REGION: ‘Expect a Cashew factory soon’ – Techiman North MP promises Constituents at National Day of Prayer and Thanksgiving

SEC warns Ghanaians against two unlicensed investment scams

Antoine Semenyo Commits Future to Bournemouth as Club Hails His Commitment

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE