Residents blame contractor for abandoned project

Accra, Oct, 07, GNA – The Residents of Abease, a locality within Mallam on Saturday attributed the flooding of their houses to a contractor for abandoning a project in the area for over three months. According to the residents, Sosamen Construction Works, contractors of a drainage project, diverted a water-way during the construction of the drainage system in the area, which had since been abandoned, leading to the flooding of their houses, whenever it rained. Mr Michael Owusu, a resident, said they were suffering because of the shoddy construction works, which had aggravated the already existing their problems, instead of helping them.

Source: GhanaWeb

You may like

GFA President Kurt Okraku Appointed Chair of CAF Interclubs Committee

We are Preparing Through ‘Economic’ Ways Ahead of President’s Cup Clash with Kotoko: Hearts of Oak head coach Didi Dramani

Ghana’s Education Minister Haruna Iddrisu Secures AC Milan Trials for 5 Young Talents

Police Arrest Man for Murder of Man who Allegedly is in Relationship with his Ex-Wife

GTEC Boss Denies Political Motive Behind Crackdown on Fake Academic Titles

Mahama pledges to implement Constitution review recommendations

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE