ECG disconnects Ghana Water Limited over GH¢999.6m debt

The Electricity Company of Ghana (ECG) has disconnected Ghana Water Limited (GWL) from the national power grid over a debt of GH¢999.6 million.

The disconnection occurred on Tuesday, June 17, 2025, as part of ECG’s ongoing nationwide revenue mobilisation.

The exercise, which started on Monday, June 16, 2025, is aimed at recovering debts owed by state institutions and private entities to stabilise ECG’s financial health.

The task force, which carried out the operation, indicated that GWL was given ample notice to settle its arrears but failed to do so.

Also, the team proceeded to the Ghana Broadcasting Corporation (GBC), which was also disconnected from the national grid over a GH¢3.15 million debt.

ECG said GBC had defaulted on a structured payment plan agreed upon earlier, prompting the disconnection.

Meanwhile, GWL has been given a 48-hour ultimatum to either settle its debt or propose an acceptable payment plan.

 

 

You may like

CS Constantine vs JS Saoura: Preview – Team News, Line-ups, Prediction and Tips | June 20 17:00 (GMT)

MC Oran vs USM Alger: Preview – Team News, Line-ups, Prediction and Tips | June 20 17:00 (GMT)

Khenchela vs El Bayadh: Preview – Team News, Line-ups, Prediction and Tips | June 20 16:00 GMT

ES Setif vs US Biskra: Preview – Team News, Line-ups, Prediction and Tips | June 20 16:00 (GMT)

Numerous factors contribute to teachers’ reluctance to teach in rural areas – Rev. Father Kingsley Dwamena Asante

The NDC Nkoko Nketenkete policy will enhance poultry production – Poultry Farmer

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE