Teshie Road Project Still On Drawing Board

Six months after work was expected to be complete on the expansion of divergent roads in the Teshie area of the La-Tema road, it has not even started.

The project, aimed at reducing the usual heavy vehicular congestion along that segment of the road, was expected to be started in June last year and to be completed in two months, but to date, no single contractor has ever been seen at the site.

The Director, Department of Urban Roads, Mr. Alex Twumasi-Boakye, in an interview with the paper in Accra, regretted the long delay of the project.

According to him, after a comprehensive study of the situation, the department decided to change the initial plan, which would have been an interim one, to a more comprehensive and a long-term programme.

Source: GhanaWeb

You may like

FOB Executives Meets Dr. Mahamudu Bawumia

Enroll in the national apprenticeship program and seize the opportunity to fulfill your future ambitions. – YEA Director

Speaker Bagbin Unveils 24-Hour Economy Initiative to Boost Productivity at Parliament

Ghana Will Not Be a Safe Haven For Drugs: NACOC Declares War on Illicit Drugs

Faith Ladies Receive GH¢10,000 Boost from Sports Minister After FA Cup Triumph

SWAG Mourns Passing of Former President Ebo Quansah

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE