GPRTU expresses concern about delay of completion of road

Tepa (Ash), Jan 5, GNA – The Tepa branch of the Ghana Private Road Transport Union (GPRTU) in the Ahafo-Ano North District has expressed concern about the delay in the completion of the 45-kilometre Mankranso-Tepa trunk road started more than two years ago.

The union has therefore called on the Ghana Highway Authority (GHA) and Kocks Consult, the consultant, to compel the contractor, P and W Ghanem, to complete the project.

Mr Nicholas Boampong, secretary of the Tepa branch of the union, said the contractor had left heaps of sand on the Tepa-Wioso portion of the road, uncompleted gutters and un-tarred isolated stretches and described the situation as dangerous to motorists.

He said the bridge over River Abu, which is one kilometre away from Tepa, was narrow and weak and called for its replacement because of the heavy trucks that use the road.

Source: GhanaWeb

You may like

Zoomlion Ghana Expands to Burkina Faso with Integrated Waste Management Project

Ghana Police Men’s Football Team Secures Division One Spot in Dramatic Penalty Shootout

Asiedu Nketia Calls for Complete Overhaul of Electoral Commission, Labels EC “Unfit for Purpose”

Ghanaian Defender Emmanuel Twumasi Joins Poland’s Piast Gliwice on Two-Year Deal

Dr. Bawumia Celebrates Launch of NPP’s Patriotic Institute in Accra

Fella Makafui features ex-husband Medikal in upcoming film ‘Serwaa’

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE