Dumsor will surely end by December – VRA

The Volta River Authority (VRA) believes that government’s promise of ensuring constant power supply by the end of the year is achievable.

The VRA says the promise by the Power Minister, Dr. Kwabena Donkor is achievable due to the measures being put in place.

The Head of Corporate Affairs at the VRA, Samuel Fletcher made the observation on Atinka FM on Friday.

Mr. Fletcher was throwing more light on the worsening power crisis the country is currently experiencing. He explained that the unavailability of fuel to operate the thermal plants at Aboadze was the problem.

He said the current worsening situation will end very soon as measures are being put in place to normalize the situation.

On July 8, Tullow Oil Ghana announced an unplanned shutdown of its FPSO at the Jubilee field, rendering the Ghana Gas Processing Plant at Atuabo unproductive.

The situation has contributed to the intensity of the power crisis, increasing the power deficit from 400 to 600 megawatts.

Source: GhanaWeb

You may like

Ghana’s Parliament to embrace local languages in debates

Health Minister to brief Parliament on COVID-19 surge

Ghana concludes debt restructuring talks in China

Ghana’s transformation requires collective effort – Cardinal Turkson

Let’s Build Bridges, Not Barriers…Mahama urges unity

Kenyan vendor shot by police during protests dies after life support switched off

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE