All 230 constituencies to be provided with fully connected CIC

Accra, June 15, GNA – Mr Haruna Iddrisu, Minister of Communications, on Tuesday said the construction of community information centres (CIC) was a major policy initiative of the Ministry to provide information and communication technology infrastructure and services to under-served and un-served communities.

Under the programme, all 230 constituencies were progressively being provided with a fully connected CIC including the one at Kukuom in the Asunafo South District

Mr Iddrisu, Member for Tamale South, was answering a question on the floor of Parliament tabled by Mr George Boakye, Member for Asunafo South, who wanted to know when the CIC in Kukuom would be made operational. He said currently the physical infrastructure for the Kukuom CIC had been completed, adding that it was among the list of twenty CIC’s each of which would be provided with ten desktop computers, one scanner, one network printer, a server, power backup system to supply electricity, local area network and internet connectivity by the end of October 2010. Mr Haruna said the equipment would be supplied and installed for use under the supervision of the Ghana Investment Fund for Electronic Communications. He said the CIC would therefore be fully operational under the care of the District Assembly before November 2010.

Source: GhanaWeb

You may like

Dr. Bawumia Celebrates Launch of NPP’s Patriotic Institute in Accra

Fella Makafui features ex-husband Medikal in upcoming film ‘Serwaa’

EOCO reportedly picks up former National Food Buffer Stock CEO 

I’ve Been Threatened to Resign – Justice Torkornoo Speaks Out on Suspension Saga

Oil prices tumble after Israel agrees to Iran ceasefire

Moliy’s “Shake it to the Max” hits Billboard Hot 100

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE