Maersk Staff Down Tools

A DANISH Shipping Company, MAERSK LINE on Friday, witnessed an industrial action as its workers laid down their tools in protest against what they termed management’s uncooperative attitude.

In the event, MV CLAES MAERSK with general goods that berthed at the Tema Port on September 13 and scheduled to leave the same day had to depart on Sunday, September 5, 2002.

When the Chronicle visited the yard of the shipping line, electricity supply was switched off causing all operations to cease.

The workers who locked the gates to the container terminal and the administrative office, were tight- lipped over what their grievances were.

However, a management source hinted that negotiations for better conditions of service were underway and that there was no need they could continue with the negotiations under duress.

The source stated that workers who did not fall under the Maritime and Dockworkers Union (MDU) belonged to an association whose executives were at a meeting with the managing director.

At least 30 trucks loaded with empty containers remained parked outside the yard and their drivers demanded ?1 million for a day for delay of their 40-footer containers while 20-footer container was going to attract ?500,000 per day.

Work, however, resumed on Saturday.

Source: GhanaWeb

You may like

Football is a Calling: Ghanaian 17-Year-Old Defender

Kwasi Kwarteng Appointed Spokesperson for Kennedy Agyapong’s NPP Flagbearer Campaign

Hanna Bissiw-Kotei Vows to Continue Galamsey Fight Despite Death Threats

Ghanaian Midfielder Michael Baidoo Joins Umm Salal SC

Kwame Poku Eyes Championship Glory with a Move to QPR

Accra Mayor proposes dedicated welfare fund for AMA Assembly Members

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE