ECG, NEDCO commence load shedding

The Electricity Company of Ghana and the Northern Electricity Distribution Company (NEDCO), the company which distributes electricity to the northern sector of the country has commenced load shedding in some parts of the country due to the technical challenges faced by the West African Gas Pipeline Company (WAGPCO).

This has subsequently affected gas supply to the Volta River Authority (VRA) and the Sunon Asogli Power Plant.

A statement copied to the Ghana News Agency noted that the problem had reduced power generation from the VRA and also led to the shut down of the Sunon Asogli Power Plant .

The statement indicated that engineers of WAGPCO were working to resolve the problem, adding that normal power supply would be restored as soon as the problem was resolved.

Source: GhanaWeb

You may like

Ghana Armed Forces Warn Public Against Fraudulent Recruitment Scams

Zoomlion Ghana Expands to Burkina Faso with Integrated Waste Management Project

Ghana Police Men’s Football Team Secures Division One Spot in Dramatic Penalty Shootout

Asiedu Nketia Calls for Complete Overhaul of Electoral Commission, Labels EC “Unfit for Purpose”

Ghanaian Defender Emmanuel Twumasi Joins Poland’s Piast Gliwice on Two-Year Deal

Dr. Bawumia Celebrates Launch of NPP’s Patriotic Institute in Accra

Public notice

Mobile applications

Our mobile app is optimized for your phone. Download it for free!

Connect With Us

© 2025, dailypost | All Rights Reserved.
WP Radio
WP Radio
OFFLINE LIVE